The Leon County Parks and Recreation Division lately launched the annual report highlighting Leon County’s accomplishments for 2019 and its present tasks that must be accomplished inside the subsequent 12 to 18 months. Under is a abstract of ten tasks.

Park at Orange Ave. and Meridian St.

In September 2019 a brand new group park opened on the nook of Orange Ave. and Meridian St. The brand new park will present ample inexperienced area for neighborhood gatherings and occasions. Additionally, inside the park avid readers will discover new packing containers providing books from the “Little Free Library” e-book sharing group.

This previous November Leon County opened its first canine park at 6808 Beech Ridge Path, throughout from the Bradfordville Neighborhood Middle. The park gives 13-acres of fenced in inexperienced area for our furry pals to run. This canine park is the biggest park of its type in Leon County.  Plus, the County might be opening a second canine park this February 14th, on the J. Lee Vause Park at 6024 Banbridge Rd. Extra data of the canine parks could also be discovered on the web site, LeonCountyFl.gov/DogPark. 

Chaires Park

The basketball courts on the Daniel B. Chaires Park, at 4768 Chaires Cross Street, have been totally renovated, and now embody court docket lighting too. The brand new set up of lights will increase the accessible hours of play for basketball video games. 

All Leon County boat landings have new kiosks which incorporates panels displaying the way to entry water high quality data. This data can be accessible of the web site at, LeonCountyWater.org.

Moreover, the trailhead for the St. Marks Headwaters
Greenway is at present beneath allowing and design. The trailhead will embody “a
nature-based playground, restrooms, entry to roughly four miles of trails
and a small “bicycle playground,” which helps new riders apply expertise.”

 As a way to create further area for the Little League program, the concession stand and restrooms are within the means of being reconstructed on the Cover Oaks Neighborhood Park, at 3250 Level View Dr.  Moreover, the tennis courts at Cover Oaks is ready to start renovations this February. These enhancements are to additional present high quality amenities for its customers.  

Apalachee Regional Park proposed facility

New development is ready to start in February 2020 for the Apalachee Regional Park, at 7550 Apalachee Pkwy, to assist cross county occasions in addition to every day use by patrons. The brand new options the park will provide are restrooms, a end line construction, a presentation stage, and an operations constructing. These new facilities are in preparations for the 2021 NCAA Cross Nation Nationwide Championship and with a view to entice different regional and state championship occasions to the group.

 A nature based mostly playground at Okeeheepkee Prairie Park, at 1294 Fuller Rd, is scheduled to start development in Could 2020. The play space is particularly designed to supply lodging, providing “textures, sounds, and colours” conducive to the wants of kids with developmental delays.    

J.R. Alford Greenway

To assist attain objectives set by the Residents Advisory Committee, to supply different person experiences for greenway patrons, Leon County is within the means of design and allowing for the development of recent single observe trails and signage on the J.R. Alford Greenway, at 2500 Pedrick Rd. The completion of the brand new trails is predicted early this spring.

Lastly, reconstruction of Crowder Touchdown is ready to start
this spring, in late March or early April. These renovations are in an effort
to boost the safety of Lake Jackson and to higher enhance entry to the
lake.

Please observe and like us:

LEAVE A REPLY

Please enter your comment!
Please enter your name here